+7 (343) 266-58-88 info@nekko.ru
Rus

Parameters

• Temperature up to 140°С

• Production casing OD, in 4-7

• Pressure up to 15 000 psi

• Volume of proppant pumped per 1 well operation:

up to 200 t for PC 4, 1/2 in

up to 400 t for PC D from 5,75 in

Cup2Cup
Innovative technology of selective hydraulic fracturing / bottomhole zone treatment / multifracturing in 1 well operation

Advantages of the technology Cup2Cup

  1. Treatment of up to 10 intervals of bottomhole zone treatment and hydraulic fracturing per well operation

  2. Possibility to flush tubing elevator
    after "STOP" mode by pumping technical fluid through annular space by hydraulic fracturing fleet

  3. Significant reduction in well startup time due to optimization of well workover and coiled tubing operations

  4. Does not require a coiled-tubing complex for bottomhole reconstruction

Selective well layout Cup2Cup

Реализованные проекты

Project PitMSFrac, Bashkortostan

Узнать подробнее

Development of wells with a jet pump during geological exploration in the Yamalo-Nenets Autonomous District

Узнать подробнее

Project “PEV – Online”, Irkutsk region

Узнать подробнее

Вам нужна консультация?

Напишите Ваш вопрос, и наши специалисты свяжутся с Вами в течение рабочего дня.

Talk to an expert
Контакты для обратной связи
+7 (343) 266-58-88 info@nekko.ru Политика конфиденциальности