+7 (343) 266-58-88 info@nekko.ru
Rus

Project “PEV – Online”, Irkutsk region

More than 30 highly qualified employees
8 fchemical field laboratories
101 test sites
26 wells
Verkhnechonskoye oil and gas condensate field

 


Problem:

The Pressure Equalizing Valve (PEV) recording when operating on a jet pump is performed by a self-contained thermomanometer installed in the jet pump insert. The quality of the PEV recording is evaluated after removing the insert with the gauge.

Решение:

A new “PEV – Online” insert was developed, allowing a complex geophysical instrument to be lowered to the bottomhole for more accurate timing and recording quality.

Результат:

Reduction of time costs for recording PEV, possibility to adjust the duration of the study in real time (increasing/reducing the recording).

Реализованные проекты

Project PitMSFrac, Bashkortostan

Узнать подробнее

Development of wells with a jet pump during geological exploration in the Yamalo-Nenets Autonomous District

Узнать подробнее