Purpose

The Pulse Horizont jet pump is designed to induce flow from the formation for the purpose of well exploration and impact on the near-wellbore zone of formations, and specifically:

  • For fields with abnormally low formation pressures and high (up to 1 Darcy) reservoir permeability
  • The sealing assembly allows low static operation up to 1000 m.

Design possibilities

Pulse Horizont allows you to carry out the following technological operations:
  • Reduction of bottomhole pressure and stimulation of inflow from the formation;
  • Geophysical surveys in the mode of set values of depressions by geophysical instruments delivered into horizontal liners with the help of coiled tubing;
  • Multi-cycle hydrodynamic studies from lower to higher depressions with registration of bottomhole pressure with autonomous gauges.
These operations can be carried out in any combination and sequence.

Principle of operation

  • The device allows you to create depressions on formations without the use of compressor units.
  • The principle of operation eliminates the possibility of explosive gas-air mixtures and uncontrolled oil and gas manifestations in the well.
  • Reduces bottomhole pressure only in the sub-packer interval. The rest of the wellbore maintains normal hydrostatic pressure.
  • Наличие обратного клапана в конструкции позволяет осуществлять воздействие на пласт методом циклических депрессий – «МЦД».
  • As a working fluid for device, a fluid used for well killing (water, saline solution, surfactant solution) is used.

Specifications

Maximum working fluid pressure, MPa
30
Maximum depth of descent, m
4000
Overall dimensions of the device case:
Maximum diameter, mm
136
Length, mm
454
Passing channel diameter, mm
62
Diameter of the sealing assembly moving along the tubing in the interval from the wellhead to the installation site of the device housing, mm
67
Coiled tubing diameter used when working with the device, mm
38,1
MTBF within 1 well operation, not less, hours
40
Warranty resource, not less than, pcs (well operation)
1
Resource when taking out mech. impurities, no more than, m3
40
Average recovery time (preparation for work), hour
5
The ratio of the decrease in hydrostatic pressure in the space under the packer from the pressure of the working fluid measured at the wellhead, not less than, % (provided that the inflow from the reservoir does not exceed 20 m3/day and the gas factor does not exceed 60 m3/m3)
100
Service

Реализованные проекты

Project PitMSFrac, Bashkortostan

Узнать подробнее

Development of wells with a jet pump during geological exploration in the Yamalo-Nenets Autonomous District

Узнать подробнее

Project “PEV – Online”, Irkutsk region

Узнать подробнее

Вам нужна консультация?

Напишите Ваш вопрос, и наши специалисты свяжутся с Вами в течение рабочего дня.

Talk to an expert
Контакты для обратной связи
+7 (343) 266-58-88 info@nekko.ru Политика конфиденциальности